Here is another set of unlabeled slides from the St. Paul’s archives, with nice views of the progress of construction. The slides were processed in April 1965, but there are no leaves on the trees and there may be a touch of snow on the nave roof, so the photographs may have bee taken a bit earlier.

First a good shot of most of the site, though only a bit of the chapel shows on the left side. This was taken from what is now the parking lot of Albany Medical Center’s South Clinical Campus, then Child’s Hospital. Was this still open land at that time? It seems not to have been paved.

Hackett Blvd April 1965, showing entire construction site

Hackett Blvd April 1965, showing entire construction site

Next, two dramatic shots of the west end of the nave, almost complete.

Hackett Blvd April 1965, exterior west end of nave

Hackett Blvd April 1965, exterior west end of nave

Hackett Blvd April 1965, exterior west end of nave

Hackett Blvd April 1965, exterior west end of nave

And finally, more detail of the nave construction, with all of the temporary supports still in place.

Hackett Blvd April 1965, construction of nave

Hackett Blvd April 1965, construction of nave

1 thought on “Early Spring 1965 — Continued Construction Progress on Hackett Boulevard

  1. Pingback: Early Autumn 1965 — Construction Continues on Hackett Boulevard | Grain, Once Scattered

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s